Rust Player Stats
Live UTC 75,437 playing

Online 80.221.91.195:28015 checked 9m ago

MS Project | SOLO/DUO

moddedcarbon
Players now0
Slots25
Full0%
7-day average0peak –
Rank#15,348top 69%
Last wipe13d agono schedule published
Next wipe–no rhythm it keeps
Launch Rust and join

By the numbersMatch stats

against its 25 slots
Players now0
0% of the slots taken
7-day average0
players on an average hour this week
7-day peak–
the fullest it got this week
48-hour peak0
the busiest hour of the last two days
On the list45 of 48 hours
hours it answered in the last two days
Server fps237
average over 48 hours; 60 or more is smooth
Standingtop 69%
of all ranked servers, on player hours over seven days
Replay

The story of the match

Players, performance and rank, hour by hour and day by day.

CrowdPlayers

AveragePeak
0123422:0007:0016:0000:0009:0019:00

Hourly average and peak, UTC.

FitnessServer performance

010020030040022:0007:0016:0000:0009:0019:00

48 hours: hourly readings. 30 to 90 days: one point a day, with the day's average and lowest fps, most entities and most memory, measured since 17 Sep. From asking the server directly; low fps and a climbing entity count mean lag.

FormRank

daily · 1 is best
RankRank in region
15k10k15k20k20 Sep27 Sep3 Oct15 Oct21 Oct28 Oct

Top 69% of all ranked servers. Ranked on player hours over the last seven days.

FixturesWipe schedule

no rhythm it keeps

Its wipes keep no rhythm, so there is no next wipe to predict. Every server wipes at the monthly force wipe.

usual gap14 daysbetween real wipes
on rhythm0%of its recent wipes
wipe-day peak1players, last three wipes
crowd held0%else halves by day 1

The first 48 hours of its last wipes

Thu 15 OctSat 26 SepThu 17 Sep
00.250.50.751+0h+9h+19h+28h+38h+47h

Players each hour, from the hour of the wipe. The latest peaked at 0, 0 hours in.

ResultsWipes

newest first
WipedPeakCrowdLastedPlayers before
Thu 15 Oct, 20:05 UTC13d ago 0 – running 0
Sat 26 Sep, 09:07 UTC32d ago 1 halved by day 1 19.5 days 1
Thu 17 Sep, 20:03 UTC41d ago 1 halved by day 1 8.5 days 0

Peak: the most players in the first 48 hours. Crowd: whether every day of the wipe kept at least half that peak, or the day it fell below. A new world less than six hours after a wipe is a restart, not a wipe of its own.

Other matches on now

Similar servers

The same kind of game, then region, group limit, rate and wipes.

The pundits

Quick answers

From the figures on this page.

Server details

Is MS Project | SOLO/DUO online, and how reliable is it?

The lights are on at MS Project | SOLO/DUO: online as you read this. The reported uptime puts the last restart at roughly 6 hours ago. 168 of 168 hours were up over the last 7 full days, 100% of the time. The first record Rust Player Stats has of it is 13 September 2026.

Does MS Project | SOLO/DUO run smoothly?

237 server fps on average over 48 hours, and never under 229. Its entity count reached 72,127: buildings, deployables and the rest of the world. Memory use reached 2,984 MB. Lag, to a player, is these two together: low fps and a rising entity count.

Which Rust version is MS Project | SOLO/DUO on?

Rust network protocol 2633 and build 162929 on Linux: that is the setup at MS Project | SOLO/DUO. Same protocol or no entry: your game must match, and Steam keeps it updated for you.

Where is MS Project | SOLO/DUO located?

No region is published by MS Project | SOLO/DUO. Where the machine physically stands is not looked up by Rust Player Stats; it shows only what the server states. The address you connect to is 80.221.91.195:28015.

Server tags

What do the server tags on MS Project | SOLO/DUO mean?

Tags published by MS Project | SOLO/DUO and picked up by the in-game browser: gmrust (Game mode): Survival, standard Rust style; mp25 (Max players): Slot count: 25; ts8 (Group limit): No more than 8 to a team, as the game sets by default; v2633 (Protocol): Your game must be on protocol 2633 to get in; cs162929 (Build): The game build here is 162929; ptrak (Networking): The network layer is RakNet, the standard one; $r? (Region code): There's no region code on this one; ^z (Modded): The game changes here through plugins or settings, so it's listed under Modded; ^y (Carbon): It uses Carbon for plugins. You will also find its current players, its queue and the age of its world in the tags, shown at the top of this page.

Which Rust Player Stats lists and filters include MS Project | SOLO/DUO?

You will find MS Project | SOLO/DUO on the following Rust Player Stats lists: Modded Rust servers, live. Searching the server list with these filters returns it: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more; Last wipe: In the last 2 weeks.

Server rules

Which map is running on MS Project | SOLO/DUO?

The procedural map on MS Project | SOLO/DUO is size 3,500, generated by the game from seed 150644954. You can look at it on RustMaps from this page, since size and seed give the same map.

What are the rules and settings on MS Project | SOLO/DUO?

No gather rate appears in the name of MS Project | SOLO/DUO. Up to 8 players to a group, which is the default. gather, build, raid: the standard game: that is the survival game mode. Fighting and raiding between players is allowed. Under Modded in the server browser: the game is changed by plugins or settings. It runs plugins: Carbon. Anti-cheat is on: VAC.

Population

What is the population on MS Project | SOLO/DUO at the moment?

Out of 25 slots, 0 are taken on MS Project | SOLO/DUO at this moment. Averaged out across the past week, the count is 0 players.

Where does MS Project | SOLO/DUO sit in the rankings?

The last seven days put MS Project | SOLO/DUO at #15,348 on player hours: top 69% of all ranked servers.

Wipe schedule

What is the wipe schedule on MS Project | SOLO/DUO?

No next wipe can be predicted for MS Project | SOLO/DUO, because it wipes at irregular times. The monthly force wipe hits every Rust server, and the next one is on Thursday 5 November at 19:00 UTC. 13 days ago, its current world was made.

What does wipe day look like on MS Project | SOLO/DUO?

At their busiest, its recent wipes drew 1 players on average. The crowd reached its peak 0 hours after the latest wipe. The crowd stayed above half that peak until the next wipe in 0% of recent wipes. It fell below half by day 1 when it didn't hold.

Joining the server

How do I join MS Project | SOLO/DUO?

In the Rust console (F1) type client.connect 80.221.91.195:28015. Alternatively, Launch Rust on this page opens Rust through Steam and drops you straight in.

GlossaryServer tags

what each one means

Published as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y

Game

gmrust
Game mode Survival, standard Rust style.
mp25
Max players Slot count: 25.
ts8
Group limit No more than 8 to a team, as the game sets by default.
v2633
Protocol Your game must be on protocol 2633 to get in.
cs162929
Build The game build here is 162929.
ptrak
Networking The network layer is RakNet, the standard one.
$r?
Region code There's no region code on this one.

Mods and access

^z
Modded The game changes here through plugins or settings, so it's listed under Modded.
^y
Carbon It uses Carbon for plugins.

Players now (cp), the queue (qp) and the wipe time (born) are in the tag string too; they change every few minutes and are shown at the top of the page. Flag meanings are Facepunch's.